Construction Glossary: Terms Used on Gulf Projects

Plain-language definitions of the commercial, quality and planning terms that come up on construction projects in the UAE and the wider Gulf: what each term means, how it is prepared, and where it connects to Arkan. Contract wording always governs, so use these entries as orientation, not legal advice.

A

  • Advance Payment

    An advance payment is a sum the employer pays the contractor before work is carried out, usually to fund mobilisation and early purchases.

  • As-Built Drawings

    As-built drawings, also called record drawings, are the final set of drawings that show the work as actually constructed, including every change made during construction.

B

  • Bill of Quantities (BOQ)

    A Bill of Quantities (BOQ) is a priced list of the work items in a construction contract, each with a description, unit, quantity and rate.

  • Building Information Modeling (BIM)

    Building Information Modeling (BIM) is a process of creating and managing a digital model of a building or infrastructure asset, in which objects carry data such as type, size, material and location.

C

  • Critical Path Method (CPM)

    The Critical Path Method (CPM) is a scheduling technique that links project activities by their dependencies and durations to find the longest chain of activities, the critical path.

D

  • Daily Report

    A daily site report is a record, completed every working day, of what happened on site: who worked, what equipment was used, what work was done, what was delivered, the weather and any incidents or instructions.

  • Defects Liability Period (DLP)

    The Defects Liability Period (DLP) is the time after completion, set in the contract, during which the contractor must return to correct defects in the works at its own cost.

E

  • Extension of Time (EOT)

    An Extension of Time (EOT) is an adjustment that extends the contract's time for completion when a delay is caused by an event the contract treats as the employer's risk or as neutral.

I

  • Inspection and Test Plan (ITP)

    An Inspection and Test Plan (ITP) is a quality document that lists, for one type of work, each inspection and test to be carried out, the standard or specification it is checked against, who performs it and who must witness or approve it before work continues.

  • Interim Payment Certificate (IPC)

    An Interim Payment Certificate (IPC) is a certificate issued during a construction contract, usually monthly, stating the amount due to the contractor for work done to date.

L

  • Liquidated Damages (LDs)

    Liquidated damages (LDs) are a pre-agreed amount, usually a daily or weekly rate, that a contractor must pay the employer if the works are not completed by the contractual date.

M

  • Material Submittal

    A material submittal is a formal package of product data, samples, test reports or drawings that a contractor sends to the consultant for review and approval before ordering or installing a material or system.

  • Method Statement

    A method statement is a document in which the contractor describes, step by step, how a specific activity will be carried out on site.

N

  • Non-Conformance Report (NCR)

    A Non-Conformance Report (NCR) is a formal record that work, materials or documents do not meet the specification, drawings or contract requirements.

P

  • Performance Bond (Bank Guarantee)

    A performance bond is a guarantee, usually issued by a bank or insurer on the contractor's behalf, that pays the employer up to a stated amount if the contractor fails to meet its obligations under the contract.

  • Preliminaries and General

    Preliminaries and General (P&G) are the costs of running the project that are not tied to a single permanent work item, such as site management, temporary facilities, insurances, site security and equipment.

  • Price Escalation

    Price escalation is the adjustment of a contract price for changes in the cost of labour, materials or other inputs during the contract period.

  • Progress Report

    A progress report is a periodic document, usually monthly, in which the contractor reports to the client and consultant how the project stands against its programme and budget.

  • Provisional Sum

    A provisional sum is an amount included in the contract price for work or costs that cannot yet be fully defined or priced at tender.

R

  • Request for Approval (RFA)

    In construction project management, an RFA usually means Request for Approval: a formal submission from the contractor to the engineer or consultant that describes an item, such as a material, drawing or method, and asks for their review comments and approval before the work proceeds.

  • Request for Information (RFI)

    A Request for Information (RFI) is a formal written question raised on a construction project when drawings, specifications or other contract documents are unclear, incomplete or in conflict.

  • Retention

    Retention money is a percentage of each certified payment that the employer holds back from the contractor as security until the works, or a stage of them, are completed and defects are corrected.

S

  • S-Curve

    An S-curve is a graph that plots cumulative progress, cost or resource use against time for a project.

  • Snag List

    A snag list, also called a punch list, is a written list of defects, incomplete work and minor faults found when inspecting a building or area before handover.

T

  • Taking-Over Certificate

    A Taking-Over Certificate is the document the engineer or employer issues to confirm that the works, or a defined section of them, are substantially complete and the employer can take possession and use them.

  • Tender Document

    Tender documents are the set of documents the employer issues to bidders so they can prepare and submit a priced offer for a project.

  • Transmittal

    A document transmittal is a formal cover record that lists the documents sent from one party to another, with their numbers, revisions, dates and the purpose of issue.

V

  • Variation Order (VO)

    A Variation Order (VO) is a formal instruction or agreement that changes the scope, quantity, quality or timing of work in a construction contract.

W

  • Work Breakdown Structure (WBS)

    A Work Breakdown Structure (WBS) is a hierarchical breakdown of the total scope of a project into smaller, manageable parts, from the whole project down to work packages.

Free templates

Blank, editable templates for the documents behind these terms: BOQ, RFI, ITP, snag list, submittals, variations, payment applications and reports.

Browse the templates

Looking up an abbreviation?

The searchable construction glossary tool covers more abbreviations, including FIDIC and Arabic-English vocabulary.

Open the glossary tool
Aerial view of construction site

Ready to Take Control of Your Projects?

See how Arkan brings schedules, BOQs, inspections, documents and approvals into one platform. Book a personalized demo with our team.

Guided onboarding
English & Arabic
Dubai-based support
Pricing tailored to your projects

We Value Your Privacy

We use cookies to enhance your browsing experience, analyze site traffic, and personalize content. By clicking "Accept All", you consent to our use of cookies. Read our Privacy Policy

If you allow Marketing Cookies, OpenAI Ads measures accepted demo requests and relates them to advertising using browser and page signals. When enabled, automatic matching may use hashed contact details. You can withdraw permission in Cookie settings. Your enquiry will still be sent if you reject marketing cookies.