Construction Glossary

Searchable database of construction abbreviations and terminology. Includes RFI, IFC, NCR, FIDIC terms, and common Arabic-English construction vocabulary for the UAE and GCC region.

Construction Terms & Abbreviations

Comprehensive glossary of construction industry abbreviations, acronyms, and terms commonly used in project documentation, contracts, and communications. Includes Arabic-English translations for regional projects.

Search Terms
Showing 51 of 51 terms

51

Abbreviations

9

Categories

Categories
Documents (5)QA/QC (6)Commercial (9)Contracts (5)Trades (4)Materials (4)Levels (8)Dimensions (5)General (5)

Download Full Glossary

Get printable PDF with all terms and abbreviations

Documents5
RFI–Request for Information

Formal request from contractor to designer for clarification

IFC–Issued for Construction

Drawing status indicating approval for construction

IFT–Issued for Tender

Drawing status for tendering purposes

AFC–Approved for Construction

Same as IFC, approved drawings

ABD–As-Built Drawing

Drawing showing actual constructed work

QA/QC6
ITP–Inspection and Test Plan

Document outlining inspection and testing requirements

NCR–Non-Conformance Report

Report documenting work not meeting specifications

WIR–Work Inspection Request

Request for inspection of completed work

MIR–Material Inspection Request

Request for approval of materials

MSS–Method Statement Submission

Document describing construction method

QCP–Quality Control Plan

Overall quality management document

Commercial9
BOQ–Bill of Quantities

Itemized list of materials and labor for pricing

VO–Variation Order

Instruction to change scope of work

CVI–Confirmation of Verbal Instruction

Written confirmation of verbal directive

PC Sum–Prime Cost Sum

Allowance for specialist work/materials

PS–Provisional Sum

Allowance for undefined work

EOT–Extension of Time

Approved extension to contract completion date

LD–Liquidated Damages

Pre-determined compensation for delay

IPC–Interim Payment Certificate

Certificate for progress payment

FPC–Final Payment Certificate

Certificate for final payment

Contracts5
FIDIC–Fédération Internationale Des Ingénieurs-Conseils

International federation publishing standard contracts

LOI–Letter of Intent

Preliminary agreement before formal contract

LOA–Letter of Award

Formal notification of contract award

NEC–New Engineering Contract

UK-based standard form of contract

JCT–Joint Contracts Tribunal

UK standard building contract

Trades4
MEP–Mechanical, Electrical, Plumbing

Building services trades

HVAC–Heating, Ventilation, Air Conditioning

Climate control systems

RC–Reinforced Concrete

Concrete with steel reinforcement

PT–Post-Tensioned

Concrete with tensioned cables

Materials4
GRC–Glass Reinforced Concrete

Lightweight concrete with glass fiber reinforcement

GRP–Glass Reinforced Plastic

Fiberglass composite material

ACM–Aluminum Composite Material

Facade cladding material

EPDM–Ethylene Propylene Diene Monomer

Rubber waterproofing membrane

Levels8
SFL–Structural Floor Level

Top of structural slab level

FFL–Finished Floor Level

Top of floor finish level

SSL–Structural Slab Level

Same as SFL

TOC–Top of Concrete

Top surface of concrete element

BOS–Bottom of Slab

Soffit level of concrete slab

TOW–Top of Wall

Top level of wall

TOB–Top of Beam

Top level of beam

BOB–Bottom of Beam

Soffit of beam

Dimensions5
CL–Center Line

Center axis of element

TYP–Typical

Applies to similar items

NTS–Not to Scale

Drawing not proportionally accurate

EQ–Equal

Equal spacing/dimension

CLR–Clear

Clear dimension, no obstructions

General5
TBC–To Be Confirmed

Information pending confirmation

TBA–To Be Advised

Information to follow

N/A–Not Applicable

Does not apply

REF–Reference

Reference document/drawing

REV–Revision

Document revision

Notes:

  • Abbreviations are commonly used in GCC and international construction projects
  • Some terms may have regional variations in meaning
  • Arabic translations follow standard construction industry usage
  • Always clarify abbreviations in formal contract documents
Send This Calculation to Arkan
Share your inputs and results with our team, along with your contact details, if you'd like to discuss them or see how Arkan handles this work.

REFERENCE INFORMATION

This tool provides standard reference data compiled from industry sources.

Note:

• Data is provided for quick reference and may not reflect the most current standards or specifications.

About This Calculator

The Construction Glossary provides a searchable database of construction industry abbreviations, terminology, and definitions commonly used across UAE and Gulf projects. Look up document types (RFI, IFC, NCR), FIDIC contract terms, technical specifications, and Arabic-English construction vocabulary. Essential for international teams, new engineers, and anyone navigating the specialized language of Gulf construction projects.

When to Use This Calculator

  • Understanding abbreviations in project correspondence and specifications
  • Looking up FIDIC contract terminology and clause meanings
  • Finding Arabic translations for technical construction terms
  • Training new team members on industry vocabulary
  • Clarifying document types and their purposes (RFI, TQ, NCR, etc.)

How to Use This Calculator

1

Search or Browse

Enter a term, abbreviation, or keyword in the search box, or browse alphabetically.

2

View Definition

See the full definition with context for how the term is used in Gulf construction.

3

Check Translation

View Arabic translations for terms when available.

4

See Related Terms

Explore related terminology to build comprehensive understanding.

Typical Scenarios in UAE & Gulf Projects

New Engineer Onboarding in Dubai

Graduate engineer joining a Dubai high-rise project uses the glossary to understand abbreviations in daily reports: RFI (Request for Information), TQ (Technical Query), NCR (Non-Conformance Report), MIR (Material Inspection Request). Accelerates integration into the project team.

FIDIC Contract Review in Abu Dhabi

Quantity surveyor prepares variation submission under FIDIC Yellow Book contract. Uses glossary to clarify contract terminology: EOT (Extension of Time), VO (Variation Order), DAB (Dispute Adjudication Board), and relevant sub-clauses for claims.

Frequently Asked Questions

Key abbreviations include: RFI (Request for Information), TQ (Technical Query), NCR (Non-Conformance Report), MIR (Material Inspection Request), IFC (Issued for Construction), IFT (Issued for Tender), VO (Variation Order), and IPC (Interim Payment Certificate).

The glossary covers FIDIC contract terms including: Employer, Contractor, Engineer, Sub-Clause references, Time at Large, EOT, DAB, Taking Over Certificate, Defects Notification Period, Final Certificate, and common Red/Yellow/Silver Book distinctions.

Yes, common construction terms include Arabic translations for bilingual Gulf project environments. This helps with official documentation that may require Arabic versions and communication with Arabic-speaking workforce and authorities.

Take Your Calculations Further

This calculator reflects the logic built into Arkan's construction management platform.

Last Updated: January 2026

Standards Reference: FIDIC Contract Forms, ISO 6707-1 Building Terminology, RICS Terminology

Need More Than Calculators?

Arkan brings all your construction management together: BOQ tracking, payment certificates, document management, scheduling, and more. All integrated. All in one place.