Equipment Cost Estimator
Estimate equipment rental costs including tower cranes, excavators, concrete pumps, generators, and more. Includes operator costs, fuel, and mobilization.
Indicative prices as of January 2026 — not a quotation. Replace default rates with current supplier quotes.
Add equipment to calculate total costs
ESTIMATION NOTICE
This calculator provides APPROXIMATE QUANTITIES for budgeting and planning purposes.
Please note:
• Results include standard wastage factors but actual waste may vary based on site conditions, workmanship, and material quality.
About This Calculator
The Equipment Cost Estimator helps contractors and project managers budget for construction equipment across UAE and Gulf projects. Estimate rental costs for tower cranes, mobile cranes, excavators, loaders, concrete pumps, generators, and compressors. Includes operator wages, fuel consumption, mobilization/demobilization, and insurance costs based on Gulf market rates.
When to Use This Calculator
- Preparing plant and equipment budgets for project tenders
- Comparing equipment rental vs. purchase options
- Estimating monthly equipment costs for cash flow planning
- Verifying plant hire invoices from subcontractors
- Planning equipment mobilization schedules
How to Use This Calculator
Select Equipment Type
Choose from tower cranes, mobile cranes, excavators, loaders, concrete pumps, generators, etc.
Enter Duration
Specify rental period in days, weeks, or months.
Add Operator Costs
Include operator wages if not provided by rental company.
Include Fuel & Mobilization
Add estimated fuel consumption and mob/demob costs.
Review Total Cost
Get breakdown of rental, operator, fuel, and total project cost.
Typical Scenarios in UAE & Gulf Projects
A tower project needs 2 tower cranes for 24 months (720 days). At the tool's indicative rate of AED 60,000 per crane per month (entered as AED 2,000/day), rental comes to 2 × 2,000 × 720 = AED 2.88M. Operators at an indicative AED 400/day add about AED 0.58M; erection, dismantling, foundations and electricity are priced separately. Rates are indicative (January 2026), not quotations.
A 15km road project requires excavators, graders, and compactors for 18 months. The estimator totals rental, fuel, operators and mobilisation for the fleet so the monthly cost can be compared with a purchase quotation.
Frequently Asked Questions
Take Your Calculations Further
This calculator reflects the logic built into Arkan's construction management platform.
Last Updated: January 2026
Standards Reference: Indicative AED rates (January 2026), not quotations