Free Snag List Template: Excel and PDF

A generic snag list (punch list) for pre-handover inspections. Record each defect with its exact location, who must fix it, the dates and the status. Excel and PDF, English and Arabic.

Download the template

The page is free to read. To download the Excel and PDF files, enter your email.

The Arkan team receives your email (and name, if you add it) and may contact you about Arkan. See our Privacy Policy.

Preview

A preview of the template layout. The files have more blank rows and, in Excel, working formulas and drop-downs.

Snag List

Project
 
Building / area
 
Inspection date
 
Inspection round no.
 
Inspected by
 
Contractor
 
No.Location (floor / room / gridline)Description of defectPhoto ref.Trade / responsiblePriorityDate raisedTarget dateDate fixedVerified byStatus
           
           
           
... (30 rows in the file)

What is included

  • Header: project, building or area, inspection date, round number, inspector and contractor
  • Defect table: number, location, description, photo reference, trade, priority, dates, verified by and status
  • Priority and status drop-downs in the Excel file
  • Sign-off lines for the contractor and the client or consultant

How to fill it in

  1. Fill in the area and the inspection round so each walk-through is a dated record.
  2. Number every defect and give an exact location (floor, room or gridline).
  3. Describe the defect plainly and note the photo reference.
  4. Assign the responsible trade, a priority and a target date.
  5. When fixed, record the date and who verified it, and only then set the status to Closed.

Do this without spreadsheets: Arkan Punch List

Arkan's Punch List keeps the same fields with photos, comments and a timeline for every item.

  • Punch lists and items with priority, assignee, photos and attachments
  • Status workflow from Draft to Closed with an activity timeline
  • Kanban board and CSV or PDF reports
Arkan punch list grid with defects and statuses

Related templates

Last updated: 2026-10-13. This is a generic template, not tied to a specific contract. Adapt it to your contract and project procedures.

Aerial view of construction site

Ready to Take Control of Your Projects?

See how Arkan brings schedules, BOQs, inspections, documents and approvals into one platform. Book a personalized demo with our team.

Guided onboarding
English & Arabic
Dubai-based support
Pricing tailored to your projects