HVAC Cooling Load Calculator

Estimate peak room cooling load for early AC sizing. Accounts for room dimensions, Gulf design conditions (46 °C / 24 °C), orientation, glazing SHGC, occupancy, equipment and outdoor air (sensible and latent).

Room Dimensions
Room: 30 m² | Volume: 90 m³
Climate & Location
Building Envelope

Top floor room under a sun-exposed roof

Internal Heat Loads

75 W sensible + 55 W latent per person, plus 2.5 L/s outdoor air

Computers, appliances and lighting (all as sensible heat)

Cooling Load

3.5 kW

Tonnage

1.0 TR

BTU/hr

12k

Required Cooling Capacity

11,899 BTU/hr

3.49 kW|0.99 Tons

Recommended AC Unit

1 Ton (12,000 BTU)

Includes 10% safety factor

Load Breakdown
Wall + Glazing Conduction1,603BTU/hr
Solar Gain (glazing SHGC)1,299BTU/hr
Occupant Load1,774BTU/hr
Equipment Load1,706BTU/hr
Outdoor Air + Infiltration4,434BTU/hr
Total Sensible Load7,848BTU/hr
Total Latent Load2,969BTU/hr
Total (before safety factor)10,817BTU/hr
Room Specifications
Floor Area30m²
Volume90m³
Climate ZoneHot & Humid (Gulf coast, 46 °C design)
Design Conditions46 °C out / 24 °C in
Outdoor Air + Infiltration24L/s
Cooling Load per m²116W/m²

Notes:

  • 1 Ton of Refrigeration = 12,000 BTU/hr = 3.517 kW
  • Safety factor of 10% included for peak loads
  • Simplified peak method: one external wall (room length × height), glazing solar gain from SHGC, outdoor air at ASHRAE 62.1 office rates
  • Gulf zones use 46 °C outdoor / 24 °C indoor, the Dubai Municipality design convention
  • Indicative only: a full hourly load calculation is needed for final design
  • Consider additional capacity for kitchen areas
  • Consult HVAC engineer for precise system design
Send This Calculation to Arkan
Share your inputs and results with our team, along with your contact details, if you'd like to discuss them or see how Arkan handles this work.

DISCLAIMER

This calculator provides ESTIMATES for preliminary planning purposes. Results are based on standard assumptions and may not reflect your specific project conditions.

By using this tool, you acknowledge that:

1. All calculations are approximate and based on typical industry standards and assumptions.

About This Calculator

The HVAC Cooling Load Calculator helps MEP engineers and contractors size air conditioning systems for buildings across the UAE and Gulf. It estimates the peak room load from conduction through the external wall, glazing and roof, solar gain through glazing (using the glass SHGC), sensible and latent heat from people and equipment, and outdoor air and infiltration. Gulf zones use the 46 °C dry-bulb / 24 °C indoor design convention used by Dubai Municipality. It is a simplified method for early sizing, not a replacement for a full hourly load calculation.

When to Use This Calculator

  • Sizing air conditioning systems for new buildings
  • Selecting AC tonnage for residential villas
  • Checking room-by-room loads before a central system design
  • Verifying HVAC consultant's load calculations
  • Estimating cooling costs for project budgets

How to Use This Calculator

1

Enter Room Dimensions

Input room length, width, and height to establish the space volume.

2

Define Envelope

Enter the window area and glazing type (U-value and SHGC), the insulation level, the orientation of the main window, and whether the room is under the roof.

3

Set Climate Zone

Select the climate zone. Gulf zones use 46 °C outdoor and 24 °C indoor design temperatures.

4

Add Internal Loads

Enter the number of occupants and the equipment and lighting watts. Outdoor air is added at 2.5 L/s per person plus 0.3 L/s per m².

5

Review Results

Get total cooling load in BTU/hr, kW, and TR (tons of refrigeration).

Typical Scenarios in UAE & Gulf Projects

West-Facing Villa Living Room in Abu Dhabi

A 10 m × 5 m living room (3 m high) with 6 m² of double low-E glazing (SHGC 0.35) facing west, standard insulation, 6 occupants and 800 W of equipment and lighting. At 46 °C / 24 °C the calculator gives 6.09 kW (1.73 TR, about 122 W/m²), including 10% safety factor, and recommends a 2 TR unit. If the room is on the top floor under the roof, the load rises to 6.78 kW (1.93 TR, about 136 W/m²).

Comparing Glazing on a West Bedroom

A 5 m × 4 m west-facing bedroom with 3 m² of glazing, 2 occupants and 300 W of equipment. With clear double glazing (SHGC 0.70) the load is 3.22 kW (0.92 TR, about 161 W/m²); switching to double low-E glass (SHGC 0.35) cuts it to 2.50 kW (0.71 TR, about 125 W/m²). Solar gain through west glass is the largest single component, so glazing choice matters more than room size.

Frequently Asked Questions

Rough Gulf benchmarks: residential 100-140 W/m², offices 120-150 W/m², retail 150-200 W/m², data centres 500+ W/m². Rooms with large west- or east-facing clear glazing, or top-floor rooms under the roof, can reach 150-180 W/m². These are rough estimates; always calculate for each project.

Dubai Municipality and the Dubai Green Building Regulations use a 46 °C dry-bulb outdoor design condition, which this calculator uses for the Gulf zones. This is more conservative than the ASHRAE 1% cooling design dry bulb for Dubai (about 43 °C). Indoor design is typically 24 °C at about 50% RH. Check the current authority requirements for your project.

Solar gain = glass area × SHGC × peak solar gain for the orientation. The calculator uses about 700 W/m² for west glass and 650 W/m² for east glass at ~25°N in summer, with a 0.8 storage factor. With clear double glazing (SHGC 0.70) that is roughly 390 W per m² of west glass; with solar-control low-E glass (SHGC 0.35) about 200 W/m². The glass U-value only affects conduction, which is much smaller.

Yes. It adds 55 W latent per person and the latent load of outdoor air and infiltration (2.5 L/s per person + 0.3 L/s per m² + 0.2 air changes per hour) at the Gulf coastal humidity difference. In humid coastal cities this is a large share of the load, which is why fresh air is often pre-treated in a separate fresh air unit.

Take Your Calculations Further

This calculator reflects the logic built into Arkan's construction management platform.

Last Updated: January 2026

Standards Reference: Simplified method based on ASHRAE Handbook of Fundamentals load components and ASHRAE 62.1 outdoor air rates; 46 °C outdoor design per Dubai Municipality convention. Indicative only.