Free Project Closeout Checklist Template

A checklist to track everything that must be done to close a construction project: handover, defects, documents, manuals, warranties, approvals and the final account. Excel and PDF, English and Arabic.

Download the template

The page is free to read. To download the Excel and PDF files, enter your email.

The Arkan team receives your email (and name, if you add it) and may contact you about Arkan. See our Privacy Policy.

Preview

A preview of the template layout. The files have more blank rows and, in Excel, working formulas and drop-downs.

Project Closeout Checklist

Project
 
Contract no.
 
Prepared by
 
Date
 
Date of practical completion
 
Defects liability period ends
 
No.CategoryCloseout itemResponsibleDue dateDate completedStatusEvidence / document ref.Remarks
         
         
         
... (22 rows in the file)

What is included

  • Header: project, contract number, completion date and end of the defects liability period
  • Closeout table with category, item, responsible person, due and completion dates, and evidence reference
  • Category drop-down: handover and testing, snags, as-builts, manuals and training, warranties, approvals, final account, demobilisation
  • Status drop-down (not started, in progress, complete, not applicable) and two signature boxes

How to fill it in

  1. Fill in the header, including the practical completion date and when the defects liability period ends, as stated in your contract.
  2. List every closeout item your contract and the local authorities require, choosing a category for each.
  3. Assign each item to one responsible person with a due date.
  4. As items are completed, enter the date and reference the evidence, such as the signed certificate or document.
  5. Review the list with the client or consultant representative and sign when all items are complete or marked not applicable.

Do this without spreadsheets: Arkan Punch List

Arkan's Punch List module tracks outstanding items by location and responsible party until each one is closed, which helps with the snagging part of closeout.

  • Location, trade, priority and due date on every item
  • Photos, company and assignee
  • Items can only be closed once resolved
Arkan punch list

Related templates

Last updated: 2026-10-14. This is a generic template, not tied to a specific contract. Adapt it to your contract and project procedures.

Aerial view of construction site

Ready to Take Control of Your Projects?

See how Arkan brings schedules, BOQs, inspections, documents and approvals into one platform. Book a personalized demo with our team.

Guided onboarding
English & Arabic
Dubai-based support
Pricing tailored to your projects