العربية

Door Schedule Generator: Build a Door Schedule with Counts

Generate a door schedule with ID, location, type, material, size and fire rating, with totals by type, material and fire rating.

Last updated: January 2026

Units
Door Schedule
D01
Schedule Summary

1

Total Doors

Doors by Type
flush: 1
Doors by Material
timber: 1
Fire Ratings
none: 1
Door Schedule
IDTypeSizeLocation
D01flush900 x 2100mmOffice 101
Your results
Email me this calculation
Leave your email and phone number and the Arkan team will send you this calculation. The calculator stays free and needs no sign-up.

We use your email and phone number to send this calculation and follow up on it. See our Privacy Policy.

ESTIMATION NOTICE

This calculator provides APPROXIMATE QUANTITIES for budgeting and planning purposes.

Please note:

• Wastage is included only where the tool says so. Actual waste varies with site conditions, workmanship, and material quality.

Embed this calculator on your site

Paste this snippet into your page. The embedded calculator is free to use and links back to this page.

About This Calculator

The Door Schedule Generator helps architects, contractors, and quantity surveyors list the doors of a project with their ID, location, type, material, size and fire rating, and read off the counts by type, material and fire rating for procurement and tendering. Hardware is not specified or edited here.

Formula

Total doors = number of rows in the schedule

Doors by type, material and fire rating = count of rows with each value

Worked example

Three-door schedule

Inputs

  • D1: flush door, 900 × 2100 mm, solid core, no fire rating, Bedroom
  • D2: 30-minute fire door, 900 × 2100 mm, solid core, 30 minute rating, Corridor, with a closer
  • D3: flush door, 800 × 2100 mm, hollow core, no fire rating, Bath

Steps

  1. Total doors = 3.
  2. By type: flush 2, fire door (30 min) 1.
  3. By material: solid core 2, hollow core 1.
  4. By fire rating: none 2, 30 minutes 1.
  5. Hardware: a lever handle on each of the 3 doors and 1 closer.

Result: 3 doors: 2 flush and 1 fire door; 2 solid core and 1 hollow core; 3 lever handles and 1 closer.

Assumptions and limits

  • Inputs and results follow the Metric/Imperial switch; formulas and worked examples are stated in metric.
  • This is a schedule and counting tool, not a design tool. It records what you enter and totals it; it does not size doors or check them against any code.
  • Door sizes are entered in millimetres as width × height and are shown as entered.
  • Fire ratings and fire door types are labels you select. The tool does not check that a rating suits the location, frame, hardware or glazing; confirm ratings against the fire strategy and the door manufacturer's certification.
  • Counts depend on consistent entry. Give each door a unique ID and use the same type, material and rating values for identical doors.
  • Frames, ironmongery, finishes and prices are not calculated. The tool does not currently let you edit hardware per door.

When to Use This Calculator

  • Creating door schedules for tender documentation
  • Recording the fire rating labels from the approved fire strategy
  • Counting doors for procurement
  • Coordinating door dimensions with partition layouts
  • Preparing door specifications for fit-out projects

How to Use This Calculator

1

Add Each Door

Add each door: ID, location, type, material, size and fire rating.

2

Set the Fire Rating

Pick the fire rating label the fire strategy requires.

3

Review the Totals

Review the totals by type, material and fire rating and the schedule table.

Typical Scenarios in UAE & Gulf Projects

Fit-Out Door List

An architect lists the doors of a fit-out with their type, size, material and fire rating, and reads off the counts by type and material for the tender.

Checking a Door Count

A quantity surveyor lists the doors from the drawings and compares the totals by type with a subcontractor's quotation. Hardware and finishes are specified separately.

Frequently Asked Questions

What fire ratings are required for doors?

Fire door ratings are set by the fire strategy, the Civil Defence approved drawings and the applicable code for each location, so take them from the approved fire strategy and the door schedule. Fire doors need the certified door set as tested, including intumescent seals, closers and the certification marks the approval requires.

What hardware should I specify for commercial doors?

Hardware is specified by the architect or hardware consultant to suit the use, the fire rating and the project specification. This generator does not specify or edit hardware, so take it from the hardware schedule.

How do I specify acoustic doors for meeting rooms?

Acoustic doors need an STC/Rw rating from the acoustic consultant's specification. Include perimeter seals, an automatic drop seal at the threshold and solid core construction as the specification requires, and coordinate frame details with the partition rating.

Last Updated: January 2026

Standards Reference: Reference only: the generator lists and counts doors and does not check compliance with any code

Do this inside Arkan

A calculator gives you one number. Arkan keeps the quantities, inspections and payment requests for the whole project in one place, in English and Arabic.

Arkan screen: boq

Need More Than Calculators?

Arkan brings all your construction management together: BOQ tracking, payment certificates, document management, scheduling, and more. All integrated. All in one place.

We Value Your Privacy

We use cookies to enhance your browsing experience, analyze site traffic, and personalize content. By clicking "Accept All", you consent to our use of cookies. Read our Privacy Policy

If you allow Marketing Cookies, OpenAI Ads measures accepted demo requests and relates them to advertising using browser and page signals. When enabled, automatic matching may use hashed contact details. You can withdraw permission in Cookie settings. Your enquiry will still be sent if you reject marketing cookies.