Free Method Statement Template

A generic method statement for one activity on site. It sets out the scope, resources, the sequence of work, safety and quality controls, and records the reviewer's decision. Excel and PDF, English and Arabic.

Download the template

The page is free to read. To download the Excel and PDF files, enter your email and phone number.

The Arkan team receives your email and phone number (and name, if you add it) and may contact you about Arkan. See our Privacy Policy.

Preview

A preview of the template layout. The files have more blank rows and, in Excel, working formulas and drop-downs.

Method Statement

Method statement no. / revision
 
Date
 
Project
 
Activity / work covered
 
Location of work
 
Prepared by
 
Specification section
 
Related ITP / risk assessment ref.
 

Scope and purpose

Resources: manpower, plant, equipment and materials

Sequence of work

StepDescription of the activityResponsibleReference / drawing
    
    
    
... (10 rows in the file)

Health, safety and environmental controls

Quality control and inspections

Permits, approvals and coordination needed before starting

Review status
Approved / Approved as noted / Revise and resubmit / Rejected
Reviewer comments
 
Reviewed by
 
Date reviewed
 

What is included

  • Header: statement number and revision, activity, location, specification section and related references
  • Sections for scope, resources, permits and coordination, safety and environment, and quality control
  • Step table with description, responsible person and reference drawing
  • Review status drop-down: approved, approved as noted, revise and resubmit, rejected

How to fill it in

  1. State the activity, the location and the specification section, and number the revision.
  2. Write the scope and list the manpower, plant, equipment and materials needed.
  3. Describe the work in the order it will be done, one step per row, with who is responsible.
  4. Add the safety, environmental and quality controls that apply, and refer to the risk assessment and the ITP.
  5. Submit for review, record the reviewer's status and comments, and start work only on the approved revision.

Do this without spreadsheets: Arkan Workflows

Arkan's workflows route documents such as method statements through the review and approval steps you define, and record each decision.

  • Approval process automation
  • Routing through the steps you define
  • Used across modules such as submittals and RFIs
Arkan workflows module

Related templates

Last updated: 2026-10-14. This is a generic template, not tied to a specific contract. Adapt it to your contract and project procedures.

Aerial view of construction site

Ready to Take Control of Your Projects?

See how Arkan brings schedules, BOQs, inspections, documents and approvals into one platform. Book a personalized demo with our team.

Guided onboarding
English & Arabic
Dubai-based support
Pricing tailored to your projects

We Value Your Privacy

We use cookies to enhance your browsing experience, analyze site traffic, and personalize content. By clicking "Accept All", you consent to our use of cookies. Read our Privacy Policy

If you allow Marketing Cookies, OpenAI Ads measures accepted demo requests and relates them to advertising using browser and page signals. When enabled, automatic matching may use hashed contact details. You can withdraw permission in Cookie settings. Your enquiry will still be sent if you reject marketing cookies.