Scaffolding Calculator: Tubes, Boards and Ties

Calculate scaffolding quantities for construction projects. Estimates standards, ledgers, transoms, platforms, ties, and total weight for tube & fitting or system scaffolds.

Last updated: January 2026

Units
Building Dimensions

Perimeter: 100 m | Facade Area: 1,500 m²

Scaffold Configuration

Bay spacing: 2 m | Lift height: 2 m

Load Class Reference (BS EN 12811)
ClassCapacity
Light Duty (0.75 kN/m²)0.75 kN/m²
Medium Duty (1.5 kN/m²)1.5 kN/m²
Heavy Duty (2.0 kN/m²)2 kN/m²
Special Duty (3.0 kN/m²)3 kN/m²
Safety Requirements
  • Scaffolding must be designed by competent person
  • Weekly inspection required per BS EN 12811
  • Tag system required for inspection status
  • Ties assumed at about 4 m vertical × 4 m horizontal (1 per 16 m²); sheeted or exposed scaffolds need closer ties per TG20 or a scaffold design

Working Area

1,600m²

Standards

102pcs

Total Weight

22.2t

Component Quantities

Standards (Verticals)

102

Ledgers (Horizontals)

900

Transoms (Cross)

450

Braces (Diagonal)

400

Additional Components
Platform Boards400pcs
Toe Boards800pcs
Wall Ties94pcs
Base Plates102pcs
Weight & Area Summary

Total Scaffold Weight

22,156 kg

22.16 t

Working Platform Area

1,600 m²

All lift levels combined

Recommendations
  • Scaffold must be inspected before first use and after any alterations
  • Competent scaffolder required for erection and dismantling
  • Ladder access bays should be at maximum 30m intervals

Notes:

  • Quantities are estimates for budgeting purposes
  • Actual design must be done by scaffolding designer
  • Add 10-15% contingency for couplers and fittings
  • Consider access requirements and loading points
  • Comply with local regulations (UAE, BS EN 12811)
Your results
Email me this calculation
Leave your email and the Arkan team will send you this calculation. The calculator stays free and needs no sign-up.

We use your email to send this calculation. See our Privacy Policy.

IMPORTANT DISCLAIMER

This calculator provides PRELIMINARY ESTIMATES ONLY and is intended for planning and budgeting purposes. Results should NOT be used for final structural design or construction without verification by a licensed Professional Engineer (PE) or Chartered Engineer (CEng).

By using this tool, you acknowledge that:

1. All calculations are indicative and may not account for site-specific conditions, load combinations, or local code requirements.

Embed this calculator on your site

Paste this snippet into your page. The embedded calculator is free to use and links back to this page.

About This Calculator

The Scaffolding Calculator helps site engineers and temporary works coordinators estimate scaffold quantities for building facades and access requirements across UAE and Gulf construction projects. Calculate standards, ledgers, transoms, platforms, ties, and bracing for both tube & fitting and system scaffolds with weight summaries for structural verification.

Formula

Perimeter = 2 × (length + width)

Bays = ⌈perimeter ÷ bay spacing⌉; lifts = ⌈height ÷ lift height⌉

Standards = (bays + 1) × 2; base plates = standards

Ledgers = bays × 2 × (lifts + 1); transoms = bays × (lifts + 1)

Braces = ⌈bays ÷ 2⌉ × lifts × 2; platforms = bays × lifts; toe boards = bays × 2 × lifts

Wall ties = ⌈perimeter × height ÷ 16⌉

Weight = (standards × height + ledgers × bay spacing + transoms × 1.2 + braces × 3) × weight per metre

Worked example

Tube and fitting scaffold around a 30 m × 20 m × 15 m building

Inputs

  • Building 30 m long, 20 m wide, 15 m high
  • Tube and fitting scaffold (bay spacing 2.0 m, lift height 2.0 m, 4.37 kg per metre of tube)
  • Medium duty load class, access stairs or ladders included

Steps

  1. Perimeter = 2 × (30 + 20) = 100 m, so bays = 100 ÷ 2 = 50 and lifts = ⌈15 ÷ 2⌉ = 8.
  2. Standards = (50 + 1) × 2 = 102, and base plates = 102.
  3. Ledgers = 50 × 2 × 9 = 900; transoms = 50 × 9 = 450; braces = 25 × 8 × 2 = 400.
  4. Platform boards = 50 × 8 = 400; toe boards = 50 × 2 × 8 = 800.
  5. Wall ties = ⌈100 × 15 ÷ 16⌉ = ⌈93.75⌉ = 94.
  6. Tube length = 102 × 15 + 900 × 2 + 450 × 1.2 + 400 × 3 = 5,070 m, so weight = 5,070 × 4.37 = 22,156 kg.
  7. Working platform area = 100 × 2.0 × 8 = 1,600 m².

Result: 102 standards, 900 ledgers, 450 transoms, 400 braces, 94 ties and about 22,156 kg of scaffold.

Assumptions and limits

  • The scaffold runs continuously around the full perimeter of a rectangular building, one bay line deep. Partial elevations, setbacks and corners with different geometry are not modelled.
  • The built-in scaffold types fix the bay spacing, lift height and tube weight. A suspended scaffold has no fixed lifts in the data, so the calculator falls back to a 2.0 m lift height for the count.
  • The load class changes only the advisory notes; it does not change the quantities.
  • Ties assume about 1 per 16 m² of scaffold face (roughly 4 m by 4 m). Sheeted, netted or wind-exposed scaffolds need closer ties and a scaffold design.
  • Weight counts tubes only. Boards, fittings, base plates and toe boards are not included in the weight.
  • Quantities are for budgeting. Final quantities and the scaffold design must come from a competent scaffold designer, and a contingency for fittings should be added.

When to Use This Calculator

  • Estimating scaffold material for facade works and finishing
  • Planning access scaffolding for MEP installation
  • Calculating scaffold weights for structural tie-back design
  • Preparing scaffold quotations for subcontractor tenders
  • Verifying scaffold supplier material schedules

How to Use This Calculator

1

Enter Building Dimensions

Input the building length, width and height; the scaffold runs round the full perimeter.

2

Select Scaffold Type

Choose tube & fitting, system scaffold, mobile tower or suspended scaffold; this sets bay length, lift height and tube weight.

3

Set Load Class and Access

Choose the load class and whether ladder access bays are needed.

4

Calculate Quantities

Get standards, ledgers, transoms, braces, platforms, toe boards, base plates, an indicative tie count (about 1 per 16 m² of face) and total weight.

Typical Scenarios in UAE & Gulf Projects

High-Rise Facade in Dubai Marina

A scaffolding contractor budgets a system scaffold round a 40 m × 20 m building, 100 m high (120 m perimeter, 12,000 m² of face). The calculator gives 50 lifts, 98 standards, 4,896 ledgers, 2,448 transoms, 2,400 platforms, about 750 ties at a typical 4 m × 4 m pattern and a total weight of about 113 tonnes. At this height the tie pattern and loads need a scaffold design.

Industrial Facility in Jubail

A contractor budgets tube & fitting scaffold round a process building for maintenance. The calculator gives component counts and total weight for transport and crane lift planning; birdcage and special access scaffolds need their own design.

Frequently Asked Questions

What scaffold standards apply in the UAE?

UAE follows BS EN 12811 for service and working scaffolds, BS EN 12810 for facade scaffolds. OSHAD CoP 53.0 governs scaffold safety requirements. Scaffold designs over 30m height typically require engineer sign-off. All scaffolders need valid scaffolding competency cards.

How often should scaffold ties be installed?

BS EN 12811-1 sets the design requirements rather than a fixed spacing. In typical practice (for example the TG20 guidance), an unsheeted scaffold is tied about every 4 m vertically and 4 m horizontally, which is what this calculator assumes (about 1 tie per 16 m² of face). Sheeted, netted or wind-exposed scaffolds need closer ties, often at every lift. Tall scaffolds need a wind load check and a scaffold design.

What is the weight capacity of standard scaffold tubes?

The safe load of a scaffold tube depends on the tube grade and wall thickness, the span or effective length, the fittings and the loading case. System scaffolds (Cuplock, Ringlock and similar) have published load tables. Always use the manufacturer's load tables and the scaffold designer's calculations.

Last Updated: January 2026

Standards Reference: BS EN 12811 Temporary Works Equipment, OSHAD CoP 53.0 Scaffolding

Do this inside Arkan

A calculator gives you one number. Arkan keeps the quantities, inspections and payment requests for the whole project in one place, in English and Arabic.