العربية

Concrete Calculator: Volume, Cement and Material Quantities

Calculate concrete volume, cement bags, and estimated cost for slabs, footings, columns, and other structural elements.

Last updated: January 2026

Units
Calculator Inputs

Total Volume

3.15 m³

Cement Bags

26 bags

Volume Calculation
Volume per unit3m³
Total volume (net)3m³
Wastage (5%)0.15m³
Total volume (with wastage)3.15m³
Material Breakdown
Cement1,260kg
Cement bags (50 kg)26bags
Sand1.26m³
Aggregate2.52m³
Water (approx.)567L
Your results
Email me this calculation
Leave your email and the Arkan team will send you this calculation. The calculator stays free and needs no sign-up.

We use your email to send this calculation. See our Privacy Policy.

ESTIMATION NOTICE

This calculator provides APPROXIMATE QUANTITIES for budgeting and planning purposes.

Please note:

• Results include standard wastage factors but actual waste may vary based on site conditions, workmanship, and material quality.

Embed this calculator on your site

Paste this snippet into your page. The embedded calculator is free to use and links back to this page.

About This Calculator

The Concrete Volume Calculator helps contractors and quantity surveyors estimate concrete quantities for construction projects across the UAE and Gulf. Calculate volumes for slabs, columns, beams, footings, and other structural elements, with automatic cement bag and material breakdown calculations. Built for Gulf construction practices and ready-mix ordering.

Formula

Slab, footing or beam: V = length × width × depth

Rectangular column: V = length × width × height

Circular column: V = π × (diameter ÷ 2)² × height

Total volume = V × number of elements

Volume with wastage = total volume × (1 + wastage % ÷ 100)

Cement (kg) = volume with wastage × cement per m³ (M15 = 320, M20 = 380, M25 = 400, M30 = 420, M35 = 450, M40 = 480 kg/m³)

Cement bags = ⌈cement kg ÷ 50⌉

Sand = 0.4 × volume with wastage (m³); aggregate = 0.8 × volume with wastage (m³); water = 180 litres per m³ of volume with wastage

Estimated cost = volume with wastage × price per m³ (only if a price is entered)

Worked example

Ground-floor slab, 10 m × 8 m × 150 mm, grade M25

Inputs

  • Shape: rectangular slab, 10 m × 8 m, thickness 150 mm (0.15 m)
  • Number of elements: 1
  • Wastage: 5%
  • Grade: M25 (400 kg of cement per m³)

Steps

  1. Volume = 10 × 8 × 0.15 = 12 m³
  2. With wastage = 12 × 1.05 = 12.6 m³
  3. Cement = 12.6 × 400 = 5,040 kg; bags = ⌈5,040 ÷ 50⌉ = ⌈100.8⌉ = 101 bags
  4. Sand = 12.6 × 0.4 = 5.04 m³; aggregate = 12.6 × 0.8 = 10.08 m³
  5. Water = 12.6 × 180 = 2,268 litres

Result: 12.6 m³ of concrete including wastage, 101 cement bags of 50 kg

Assumptions and limits

  • Material quantities use fixed approximate ratios per m³ of concrete (sand 0.4 m³, aggregate 0.8 m³, water 180 litres) and a cement content set by the selected grade. They are for rough estimating, not mix design.
  • Ready-mix is normally ordered by volume (m³) from the supplier's mix design: use the volume result for that and treat the material split as indicative.
  • The grade list (M15 to M40) is a simple selector for cement content. Check the concrete class, cover, exposure and durability requirements in the governing code and project specification.
  • Wastage covers spillage, over-excavation and formwork tolerance. Typical allowances vary by site: set your own.
  • The optional cost uses the price you enter per m³ (or per yd³) and shows it in AED. It excludes pumping, admixtures, delivery and testing unless you include them in the price.

When to Use This Calculator

  • Preparing ready-mix concrete orders for site pours
  • Estimating material quantities for tender submissions
  • Calculating cement bags for small batch mixing on site
  • Verifying subcontractor quantity claims
  • Planning concrete delivery schedules for large pours

How to Use This Calculator

1

Select Element Type

Choose the structural element: slab, column, beam, footing, or custom shape.

2

Enter Dimensions

Input length, width, and thickness/height in meters.

3

Select Concrete Grade

Choose the mix design (M20, M25, M30, etc.) based on structural requirements.

4

Add Waste Factor

Apply 5-10% waste factor for spillage, over-excavation, and irregularities.

5

Review Results

Get total volume in cubic meters, cement bags required, and material breakdown.

Typical Scenarios in UAE & Gulf Projects

High-Rise Residential Tower in Dubai

A contractor is planning concrete pours for a 40-story tower. Using the calculator for each floor's slabs and columns, they estimate 850 m³ per typical floor and coordinate with the ready-mix supplier for optimal delivery scheduling.

Villa Foundation in Abu Dhabi

A small contractor is pricing a villa foundation package. The calculator helps estimate 45 m³ for strip footings and 12 m³ for ground beams, with cement bag breakdown for site-mixed concrete options.

Infrastructure Bridge Pier in Saudi Arabia

An infrastructure contractor needs to estimate concrete for 6 bridge piers. The calculator provides volume per pier (28 m³ each) and helps plan the staging of ready-mix deliveries for continuous pours.

Frequently Asked Questions

How do you calculate concrete volume for a slab?

Slab volume = Length × Width × Thickness. For a 10m × 8m slab that is 0.15m thick: 10 × 8 × 0.15 = 12 m³. Add 5-10% waste factor for practical ordering: 12 × 1.05 = 12.6 m³ order quantity.

How many cement bags are in 1 cubic meter of concrete?

For M20 grade concrete (1:1.5:3 mix), this calculator uses 380 kg of cement per cubic meter (about 8 bags of 50 kg). M25 uses 400 kg, M30 420 kg. Actual mix designs vary by supplier and specification, so treat the result as an estimate.

What waste factor should I use for concrete in UAE?

Standard waste factors in UAE construction: 5% for machine-placed concrete, 7-8% for pump-placed concrete, 10% for irregular shapes or difficult access. This accounts for spillage, pump line residue, and over-excavation.

Last Updated: January 2026

Standards Reference: Calculations aligned with ACI 318 and Gulf construction practices

Do this inside Arkan

A calculator gives you one number. Arkan keeps the quantities, inspections and payment requests for the whole project in one place, in English and Arabic.

Arkan screen: boq

Need More Than Calculators?

Arkan brings all your construction management together: BOQ tracking, payment certificates, document management, scheduling, and more. All integrated. All in one place.