Free Construction Calculators & Tools/Extension of Time Calculator (EOT)

Extension of Time Calculator (EOT)

Calculate Extension of Time entitlements for construction delays. Analyze delay events, float consumption, concurrent delays, and generate EOT claim summaries.

Contract Details

Available float in critical path

Delay Events
Event #1
Event #2
Delay Event Types
Employer DelayEOT Entitled
Contractor DelayNot Entitled
Neutral Event (Force Majeure)EOT Entitled
Concurrent DelayPartial

EOT Entitlement

44

New Completion

2025-02-13

Float Remaining

30

Extension of Time Summary

Total EOT Entitlement

44 days

New Completion Date

2025-02-13

Delay Analysis Breakdown
Late site access by Employer
+28 days
Gross: 28dFloat: -0dNet: 28d
Unusual weather conditions
+16 days
Gross: 16dFloat: -0dNet: 16d
Delays by Category
Employer Delays28days
Neutral Events16days
Contractor Delays0days
Total Critical Delay44days
Float Consumption0 / 30 days

30 days of float remaining

Notes:

  • EOT entitlement based on SCL Delay Protocol principles
  • Float is consumed before delays become critical
  • Concurrent delays may require detailed window analysis
  • Consult contract clauses for specific EOT provisions
  • Document all delay events contemporaneously
Save Your Calculation
Get a professional PDF report of this calculation, plus access to templates and additional resources.

FINANCIAL DISCLAIMER

This calculator provides INDICATIVE FIGURES for reference purposes only.

Important:

1. Results are based on standard formulas and user-provided inputs. Actual contractual amounts may differ based on specific contract terms and conditions.